Operational reliability engineering

Download brochure

VB Oil & Gas Energy: Operational reliability engineering. Request evaluation

Coiled tubing

  • Services
  • Coiled tubing

Well services

Coiled tubing

Intervene the well with continuous tubing, without stacking a workover.

Coiled tubing on location: the unit circulates, cleans or stimulates the well in place.

This is cleanout, acid or continuous circulation. It is not logging, slickline, or a production test.

What we do on location

Coiled tubing

Coiled-tubing unit in the field. We work the well, not a rotary on the bench.

  • Sand and scale cleanout
  • Matrix stimulation
  • Fluid circulation
  • Nitrogen and displacement
  • Completion support
Crew hammering up the treating line
Benefits

Why this line

Technician checking a well returns sample

The well is cleaned in place

Sand, scale or acid on location. The well produces; the kit does not sit in the yard.

Pre-job safety meeting before the coiled tubing job

Scope closed in writing

Cleanout, acid or circulation, in writing. That well is quoted, not a generic package.

Technician working at the injector head

Field line, not the shop

Coiled tubing at the well, on location. The rotary shop is another line and scope.

Does this well need coiled tubing?

We send an evaluation with scope and timing. No open-ended quote.

Request evaluation